Phutung GIS Substation
Kathmandu Valley, NP
Installation, testing and commissioning of the 132/11 kV GIS Phutung substation project with an installed capacity of two 45 MVA transformers, totaling 90 MVA. The substation is connected to the national grid by tapping the 132 kV double-circuit transmission line extending from the Balaju-Chapali route.
132/11 kV GIS • 90 MVA See Project Detail